1
|
ZIMUCBL167848
|
ETHYL ALCOHOL FOR FUEL(GASOHOL1X40HC BOMBAS DE AGUA PARA CALDERA CON SUS ACCESORIOS Y PARTES
|
INCHEM SERVICES S.R.L.
|
SADELMI SPA
|
2010-03-24
|
Jamaica
|
20745 Kgs
|
257 PCE
|
2
|
ZIMUNAP063124
|
S.T.C.: NO. 5 PALLET, NO. 1 BOX ,NO. 1 BUNDLE CONTAINING PROFILES, PLATES, U -BOLTS FOR PIPES, BOLTS, EXPANS TOTAL GROSS WEIGHT : KGS. 15056,- TOTAL NET WEIGHT : KGS. 15032,- FREIGHT PREPAID
|
BAHIA LAS MINAS CORP
|
SADELMI S.P.A.
|
2009-08-17
|
Italy
|
15087 Kgs
|
7 PCK
|
3
|
ZIMUGOA054662
|
NO. 11 BUNDLE, NO. 8 PALLET, NO. 1 CRATE,NO. 1 DRUM CONTAINING ELECTRICAL COMPONENTS AS PACKING LIST 46/14073-1 AND PACKING LIST 46/13337-3.BOILER EQUIPMENT DESIGN, ENGINEERING, PROCUREMENT OF EQUIPMENTAND MATERIALS FOR THE SUPPLY OF THE COALFIRED BOILER FOR THE CAPTIONED PROJECT INCLUDING TECHNICAL ADVISORS FOR ERECTION,COMMISIONING, TRAININGAND ASSISTANCE TORELIABILITY RUN FREIGHT PREPAID
|
BAHIA LAS MINAS CORP
|
SADELMI SPA
|
2009-05-18
|
Italy
|
12171 Kgs
|
21 PCK
|
4
|
ZIMUNAP062089
|
BOILER EQUIPMENT DESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE CO RELIABILITY RUN. SPOOLS AS PER PL N.46/010433-12 N.46/010433-13BOILER EQUIPMENT DESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE CO RELIABILITY RUN. SPOOLS AS PER PL N.46/010433-13BOILER EQUIPMENT DESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE CO RELIABILITY RUN. SPOOLS AS PER PL N.46/010433-13
|
BAHIA LAS MINAS CORP
|
SADELMI SPA
|
2009-04-06
|
Italy
|
9652 Kgs
|
28 PCK
|
5
|
HLCUGOA090245960
|
FOUNDATION PARTS
|
CEM COMPANIA DE ENERGIA MEXICANA
|
SADELMI SPA
|
2009-03-22
|
Italy
|
4880 Kgs
|
2 PCS
|
6
|
ZIMUGOA052579
|
AS PER PL N.46/12888-5 BOILER EQUIPMENTDESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS F RELIABILITY RUN. SPOOLSAS PER PL N.46/13337-2 46/13335-1 / 46/12604-2 46/13726-1 / 46/13534-1 PLANA 1BOILER EQUIPMENT DESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE CO RELIABILITY RUN. SPOOLSAS PER PL N.46/13728-1 BOILER EQUIPMENTDESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS F RELIABILITY RUN. SPOOLS FREIGHT PREPAIDAS PER PL N.46/12888-5 BOILER EQUIPMENTDESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS F RELIABILITY RUN. SPOOLSAS PER PL N.46/13349-1 BOILER EQUIPMENTDESIGN, ENGINEERING,PROCUREMENT OF EQUIPMENT AND MATERIALS F RELIABILITY RUN. SPOOLS
|
BAHIA LAS MINAS CORP
|
SADELMI SPA
|
2009-03-16
|
Italy
|
48553 Kgs
|
40 PCE
|
7
|
ZIMUGOA051178
|
AS PER PKGS N.5 OF PL N. 46/12888-4BOILER EQUIPMENTDESIGN, ENGINEERING, PROCUREMENT OF EQUIPMEN SPOOLS FREIGHT PREPAID
|
BAHIA LAS MINAS CORP
|
SADELMI S.P.A.
|
2009-01-24
|
Italy
|
8518 Kgs
|
1 PCK
|
8
|
ZIMUNAP061537
|
AS PER PL N. 46/11046-4 BOILER EQUIPMENTDESIGN, ENGINEERING, PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THECOAL-FIRED BOILER FOR THE CAPTIONED PROJECT, INCLUDING TECHNICAL ADVISORS FOR ERECTION, COMMISSIONING, TRAINING AND ASSISTANCE TO RELIABILITY RUN. TOTAL NUMBER OFPKGS:2 CONTAINING: CONTROL VALVES TOTAL GROSS WEIGHT:2870,00KGS TOTAL NET WEIGHT:2470,00KGS FREIGHT PREPAID GOODS ON BOARD
|
BAHIA LAS MINAS CORP
|
SADELMI S.P.A.
|
2009-01-24
|
Italy
|
2876 Kgs
|
2 CAS
|
9
|
ZIMUGOA051048
|
1 PKGS AS PER PKGS N. 3 OF PL N. 46/13175-1 1976.00 KGS 5 PKGS OF PL N. 46/13289-1 1326.00 KGS 1 PKGS OF PL N. 46/11824-1 170.00 KGS BOILER EQUIPMENT DESIGN, ENGINEERING, PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE COAL-FIRED BOILER TOTAL NUMBER OF PKGS: 7 CONTAINING: CONTROL VALVES - BRACH ETS, ANGLES, PLATES, BEAMS, SCREWS, NUTS, WASHERS, CONSTANT SPRING HANGERS
|
BAHIA LAS MINAS CORP
|
SADELMI S.P.A.
|
2009-01-20
|
Spain
|
3479 Kgs
|
7 PCK
|
10
|
ZIMUGOA051047
|
PKGS AS PER PKGS N. 3 OF PL N. 46/12888-3 BOILER EQUIPMENT DESIGN, ENGINEERING, PROCUREMENT OF EQUIPMENTAND MATERIALS FOR THE SUPPLY OF THE COAL-FIRED BOILER CONTAINING: CONSTANT SPRING HANGERS AND ANCILLARIES - SPOOLS1 PKGS AS PER PKGS N. 4 OF PL N. 46/12888-3 6548.00 KGS 2 PKGS AS PER PKGS N. 1+2 OF PL N. 46/12175-1 3310.00 KGS BOILER EQUIPMENT DESIGN, ENGINEERING, PROCUREMENT OF EQUIPMENT AND MATERIALS FOR THE SUPPLY OF THE COAL-FIREDBOILER CONSTANT SPRING HANGERS AND ANCILLARIES - SPOOLS
|
BAHIA LAS MINAS CORP
|
SADELMI S.P.A.
|
2009-01-20
|
Spain
|
21413 Kgs
|
4 PCK
|