|
1
|
MINERAL DE HIERRO A GRANEL (TIPO FINO) CONTRATO:JM-2025-11 FE:58.33%,, H2O:1.67000%
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-10-01
|
PERU
|
6029142 Kgs
|
5928.46 KG
|
|
2
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO:JM-2025-10 FE:61.15%, H2O:0.61666%,
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-10-01
|
PERU
|
19354348 Kgs
|
19235 KG
|
|
3
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO:JM-2025-09
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-09-02
|
PERU
|
30912464 Kgs
|
30711.33 KG
|
|
4
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) HIERRO 61% CONTRATO: JM-2024-04
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-05-28
|
PERU
|
38003120 Kgs
|
38003120.00 KG
|
|
5
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) HIERRO: 61% CONTRATO: JM- 2024-003
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-04-19
|
PERU
|
36532030 Kgs
|
36532030.00 KG
|
|
6
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) FE:61% CONTRATO: JM- 2024-02
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-02-23
|
PERU
|
38514690 Kgs
|
38514690.00 KG
|
|
7
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) FE: 61% CONTRATO: JM- 2024-01
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-01-19
|
PERU
|
36625530 Kgs
|
36625530.00 KG
|
|
8
|
MINERAL DE HIERRO A GRANEL (TIPO FINO) HIERRO 61% CONTRATO: JM- 2023-11
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2023-12-19
|
PERU
|
20992260 Kgs
|
20992260.00 KG
|
|
9
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) HIERRO 61% CONTRATO: JM- 2023-10
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2023-12-19
|
PERU
|
14017550 Kgs
|
14017550.00 KG
|
|
10
|
HIERRO A GRANEL (TIPO CHANCADO) HIERRO 61.57% CONTRATO: JM- 2023-09
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2023-11-13
|
PERU
|
38986330 Kgs
|
38847276.00 KG
|