1
|
SPARE FOR AUTOMATIC SHUTTLELESS LOOMS. (AS PER PACKINGLIST O N DTD. 20.07.2024) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2024-09-03
|
CHINA
|
16800.00 KGS
|
2
|
SPARE FOR AUTOMATIC SHUTTLELESS LOOMS. (AS PER PACKINGLIST O N DTD. 15.01.2024) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2024-02-10
|
CHINA
|
11875.00 KGS
|
3
|
SPARE FOR AUTOMATIC SHUTTLELESS LOOMS. (AS PER PACKINGLIST O N DTD. 20.06.2023) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2023-08-05
|
CHINA
|
15800.00 KGS
|
4
|
SPARES FOR SHUTTLELESS LOOMS. AS PER PACKINGLIST DTD. 25.10.2022) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2022-11-23
|
CHINA
|
23635.00 KGS
|
5
|
SPARES FOR SHUTTLELESS LOOMS (AS PER PACKINGLIST DTD.18.07.2022) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2022-08-13
|
CHINA
|
18502.00 KGS
|
6
|
SPARES FOR SHUTTLELESS LOOMS AS PER PACKING LIST DTD. 25.03.2022 1 LOT
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO.,LTD
|
2022-05-03
|
CHINA
|
20937.80 KGS
|
7
|
SPARE FOR SHUTTLELESS LOOMS (AS PER PACKING LIST DTD. 20.06.2021) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2021-08-21
|
CHINA
|
14755.90 KGS
|
8
|
SPARE FOR SHUTTLELESS LOOMS (AS PER PACKING LIST DTD. 20.06.2021) (1 LOT)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2021-08-21
|
CHINA
|
14755.90 KGS
|
9
|
SPARE FOR SHUTTLELESS WEAVING LOOMS (1 LOT) (AS PER PACKINGLIST DTD. 02.04.2020)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2020-05-14
|
CHINA
|
13750.00 KGS
|
10
|
SPARE FOR SHUTTLELESS WEAVING LOOMS (1 LOT) (AS PER PACKINGLIST DTD. 02.04.2020)
|
RUKSON ENGINEERING WORKS
|
SHAOXING XINZE TEXTILE MACHINERY CO., LTD.
|
2020-05-14
|
CHINA
|
13750.00 KGS
|